Getting Started
Default solution folder, feel free to edit or delete it.
HARDWARE INSTALLATION Connect VGA cable from monitor to computer VGA port Connect USB cable to computer USB port Connect power cord to touch monitor ...
Wed, 26 Dec, 2018 at 2:57 PM
HARDWARE INSTALLATION Mount the pole display to the metal base plate using the mounting hardware provided. The pole display can be used in a freestanding...
Wed, 26 Dec, 2018 at 2:58 PM
HARDWARE INSTALLATION Component Placement The following is recommended when you plan the LS8000 system setup: Place the LS8000 so that you can use the mo...
Wed, 26 Dec, 2018 at 3:00 PM
HARDWARE INSTALLATION Connecting KB9000 to KDS controller Connect the RJ-RJ interface cable connector to the KB9000. Connect the other RJ11 connector of...
Wed, 26 Dec, 2018 at 3:10 PM
Hardware Installation: Component Placement The following is recommended when you plan the Logic Net setup: Place the LS6100 so that y...
Tue, 20 Aug, 2019 at 11:05 AM
COMPONENT PLACEMENT The following is recommended when you plan the LC8100 setup: Place the LC8100 so that: 1. The RESET button is accessible...
Tue, 20 Aug, 2019 at 11:05 AM
Hardware Installation Be careful with your new LCD monitor, the monitor is very sophisticated and delicate. Turn off the monitor and ...
Wed, 21 Jul, 2021 at 1:54 PM
Connecting Printer to Computer or POS Terminal Connect the interface cable (USB/serial) to the printer. Connect the other e...
Thu, 22 Aug, 2019 at 9:49 AM
Hardware Installation Remove the MSR mount cover from the monitor. 2. Insert MSR module. Make sure reader has been...
Thu, 22 Aug, 2019 at 10:46 AM
The PDX3000/LDX9000/LTX9000/LDX1000 family of universal line displays has been preassembled to make the installation as simple as possible. Please follow st...
Wed, 24 Aug, 2022 at 2:07 PM